
Concrete
Ready-mix concrete, screeds and special mixes. Delivery to your construction site and placement by concrete pump.
A mix for your structure
We supply concrete for foundations, floors and specialist construction. Our sales team or technologist can help select a mix.
Delivery and pumping
We deliver concrete to your construction site and arrange placement using a concrete pump.
Verified quality
We check the properties of our concrete mixes through certified concrete testing.
Complete price lists
Quick ordering of earth-moist concrete with delivery
Need earth-moist concrete delivered to your site? Call one of our transport partners to arrange the type of concrete, quantity in m³, delivery time and exact unloading point.
You pay the carrier for both the concrete and delivery at the unloading point.
- Mr SchwambergerMAN 10 m³ · 14 t
MAN 4 m³ · 3.5 t602 324 041 - Karel HoffmanDAF 3.5 m³ · 7 t737 339 994
- Mr FrajmanAvia 3 m³ · 3 t776 617 865
- Ms FrajmanováMulticat 1 m³ · 1 t602 324 041
Products and prices
Choose a variant, enter the quantity and add the item to your enquiry. The unit is shown with each price.
Ready-mix concrete
Select consistency and exposure class according to your project. Prices are per m³.
| Product / variant | Price excl. VAT | Price incl. VAT21 % | Quantity | Total excl. VAT | Total incl. VAT | Add to enquiry |
|---|---|---|---|---|---|---|
| Ready-mix concrete C 8/1016 mm · S3 · - | 2,560 CZK/ m³ | 3,098 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 8/1016 mm · S1 · - | 2,270 CZK/ m³ | 2,747 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 12/1516 mm · S4 · X0 | 2,710 CZK/ m³ | 3,279 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 12/1516 mm · S3 · X0 | 2,700 CZK/ m³ | 3,267 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 12/1516 mm · S1 · X0 | 2,380 CZK/ m³ | 2,880 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 16/2016 mm · S4 · X0 | 2,850 CZK/ m³ | 3,449 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 16/2016 mm · S3 · X0 | 2,830 CZK/ m³ | 3,424 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 16/2016 mm · S1 · X0 | 2,510 CZK/ m³ | 3,037 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 20/2516 mm · S4 · XC2 | 3,060 CZK/ m³ | 3,703 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 20/2516 mm · S3 · XC2-3 | 3,040 CZK/ m³ | 3,678 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 20/2516 mm · S3 · X0, XC1 | 2,980 CZK/ m³ | 3,606 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 20/2516 mm · S1 · X0 | 2,660 CZK/ m³ | 3,219 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 25/3016 mm · S4 · X0, XC1-3, XD1-2, XF1, XA1 | 3,250 CZK/ m³ | 3,933 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 25/3016 mm · S3 · X0, XC1-3, XD1-2, XF1, XA1 | 3,180 CZK/ m³ | 3,848 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 25/3016 mm · S1 · X0, XC1 | 2,860 CZK/ m³ | 3,461 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 30/3716 mm · S4 · XD3, XA3 | 3,570 CZK/ m³ | 4,320 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 30/3716 mm · S4 · X0, XC1-4, XD1-2, XF1, XA1-2 | 3,460 CZK/ m³ | 4,187 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 30/3716 mm · S3 · XD3, XA3 | 3,550 CZK/ m³ | 4,296 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 30/3716 mm · S3 · X0, XC1-4, XD1-2, XF1, XA1-2 | 3,440 CZK/ m³ | 4,162 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 30/3716 mm · S1 · X0, XC1-3 | 3,110 CZK/ m³ | 3,763 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 37/4516 mm · S4 · X0, XC1-4, XD1-3, XF1, XA1-3 | 3,950 CZK/ m³ | 4,780 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 37/4516 mm · S3 · X0, XC1-4, XD1-3, XF1, XA1-3 | 3,930 CZK/ m³ | 4,755 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C 37/4516 mm · S1 · X0, XC1-3 | 3,580 CZK/ m³ | 4,332 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C -/516 mm · S3 · - | 2,240 CZK/ m³ | 2,710 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C -/516 mm · S1 · - | 1,900 CZK/ m³ | 2,299 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C -/7,516 mm · S3 · - | 2,370 CZK/ m³ | 2,868 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Ready-mix concrete C -/7,516 mm · S1 · - | 2,170 CZK/ m³ | 2,626 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — |
Concrete, delivery and pumping price list · Effective from 1 March 2025
Screeds
Earth-moist S1 mixes with a maximum aggregate size of 4 mm.
Earth-moist S1 mixes with a maximum aggregate size of 4 mm.
Product details| Product / variant | Price excl. VAT | Price incl. VAT21 % | Quantity | Total excl. VAT | Total incl. VAT | Add to enquiry |
|---|---|---|---|---|---|---|
| P-175 · C -/5 · S1 · 4 mm | 2,260 CZK/ m³ | 2,735 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-200 · C -/7,5 · S1 · 4 mm | 2,350 CZK/ m³ | 2,844 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-250 · C 8/10 · S1 · 4 mm | 2,480 CZK/ m³ | 3,001 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-275 · C 12/15 · S1 · 4 mm | 2,560 CZK/ m³ | 3,098 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-300 · C 16/20 · S1 · 4 mm | 2,690 CZK/ m³ | 3,255 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-325 · C 20/25 · S1 · 4 mm | 2,790 CZK/ m³ | 3,376 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-350 · C 25/30 · S1 · 4 mm | 2,910 CZK/ m³ | 3,521 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| P-400 · C 30/37 · S1 · 4 mm | 3,060 CZK/ m³ | 3,703 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — |
Concrete, delivery and pumping price list · Effective from 1 March 2025
Road and special mixes
| Product / variant | Price excl. VAT | Price incl. VAT21 % | Quantity | Total excl. VAT | Total incl. VAT | Add to enquiry |
|---|---|---|---|---|---|---|
| Road and special concreteSSC 3/4 · stabilisation · S1 | 1,510 CZK/ m³ | 1,827 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Road and special concreteSSC 5/6 · KSC II · S1 | 1,600 CZK/ m³ | 1,936 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Road and special concreteSSC 8/10 · KSC I · S1 | 1,700 CZK/ m³ | 2,057 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Road and special concreteSSC 12/15 · sub-base concrete · S1 | 1,790 CZK/ m³ | 2,166 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Road and special concreteMCB · drainage concrete · S1 | 2,470 CZK/ m³ | 2,989 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Road and special concreteSPVK3 · fill 3 MPa · S5 | 1,810 CZK/ m³ | 2,190 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Road and special concreteSPVK1 · fill 1 MPa · S5 | 1,580 CZK/ m³ | 1,912 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Industrial floor concreteC 20/25 · S4 · X0, XC1-2 | 3,100 CZK/ m³ | 3,751 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Industrial floor concreteC 25/30 · S4 · X0, XC1-4, XD1-2, XF1-3, XA1-2 | 3,300 CZK/ m³ | 3,993 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Industrial floor concreteC 30/37 · S4 · X0, XC1-4, XD1-3, XF1-4, XA1-3 | 3,500 CZK/ m³ | 4,235 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Easy-to-compact concreteC 16/20 · SF1 · X0, XC1 | 2,950 CZK/ m³ | 3,570 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Easy-to-compact concreteC 20/25 · SF1 · X0, XC1-4, XD1-2, XF1, XA1 | 3,150 CZK/ m³ | 3,812 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Easy-to-compact concreteC 25/30 · SF1 · X0, XC1-4, XD1-2, XF1, XA1-2 | 3,350 CZK/ m³ | 4,054 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Easy-to-compact concreteC 30/37 · SF1 · X0, XC1-4, XD1-2, XF1, XA1-2 | 3,550 CZK/ m³ | 4,296 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Piling concreteC 25/30 · S4 · X0, XC1-3, XD1-2, XF1, XA1 | 3,300 CZK/ m³ | 3,993 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| Piling concreteC 25/30 · S4 · X0, XC1-4, XD1-2, XF1, XA1-2 | 3,500 CZK/ m³ | 4,235 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — | |
| MZK Gc (S) 0/31.50/31,5 · S1 | 1,340 CZK/ m³ | 1,621 CZK/ m³ | Enter a whole number from 1 to 100,000. | — | — |
Concrete, delivery and pumping price list · Effective from 1 March 2025
Delivery
The price per round trip includes delivery to the site and back, plus 30 minutes of unloading.
| Batching plant to site distance | Round trip excl. VAT | Round trip incl. 21% VAT |
|---|---|---|
| up to 4 km | 1,500 CZK | 1,815 CZK |
| 4–6 km | 1,925 CZK | 2,329 CZK |
| 6–8 km | 2,350 CZK | 2,844 CZK |
| 8–10 km | 2,775 CZK | 3,358 CZK |
| 10–12 km | 3,200 CZK | 3,872 CZK |
| 12–14 km | 3,433 CZK | 4,154 CZK |
| 14–16 km | 3,666 CZK | 4,436 CZK |
| 16–18 km | 3,899 CZK | 4,718 CZK |
| 18–20 km | 4,132 CZK | 5,000 CZK |
| 20–22 km | 4,365 CZK | 5,282 CZK |
| 22–24 km | 4,598 CZK | 5,564 CZK |
| 24–26 km | 4,831 CZK | 5,846 CZK |
| 26–28 km | 5,064 CZK | 6,127 CZK |
| 28–30 km | 5,297 CZK | 6,409 CZK |
| 30–35 km | 5,530 CZK | 6,691 CZK |
| 35–40 km | 5,763 CZK | 6,973 CZK |
Rates per m³ at full load
| Batching plant to site distance | MIX 6 m³ | MIX 9 m³ | MIX 10 m³ |
|---|---|---|---|
| up to 4 km | 250 CZKexcl. VAT303 CZKincl. 21% VAT | 167 CZKexcl. VAT202 CZKincl. 21% VAT | 150 CZKexcl. VAT182 CZKincl. 21% VAT |
| 4–6 km | 321 CZKexcl. VAT388 CZKincl. 21% VAT | 214 CZKexcl. VAT259 CZKincl. 21% VAT | 193 CZKexcl. VAT234 CZKincl. 21% VAT |
| 6–8 km | 392 CZKexcl. VAT474 CZKincl. 21% VAT | 261 CZKexcl. VAT316 CZKincl. 21% VAT | 235 CZKexcl. VAT284 CZKincl. 21% VAT |
| 8–10 km | 463 CZKexcl. VAT560 CZKincl. 21% VAT | 308 CZKexcl. VAT373 CZKincl. 21% VAT | 278 CZKexcl. VAT336 CZKincl. 21% VAT |
| 10–12 km | 533 CZKexcl. VAT645 CZKincl. 21% VAT | 356 CZKexcl. VAT431 CZKincl. 21% VAT | 320 CZKexcl. VAT387 CZKincl. 21% VAT |
| 12–14 km | 572 CZKexcl. VAT692 CZKincl. 21% VAT | 381 CZKexcl. VAT461 CZKincl. 21% VAT | 343 CZKexcl. VAT415 CZKincl. 21% VAT |
| 14–16 km | 611 CZKexcl. VAT739 CZKincl. 21% VAT | 407 CZKexcl. VAT492 CZKincl. 21% VAT | 367 CZKexcl. VAT444 CZKincl. 21% VAT |
| 16–18 km | 650 CZKexcl. VAT787 CZKincl. 21% VAT | 433 CZKexcl. VAT524 CZKincl. 21% VAT | 390 CZKexcl. VAT472 CZKincl. 21% VAT |
| 18–20 km | 689 CZKexcl. VAT834 CZKincl. 21% VAT | 459 CZKexcl. VAT555 CZKincl. 21% VAT | 413 CZKexcl. VAT500 CZKincl. 21% VAT |
| 20–22 km | 728 CZKexcl. VAT881 CZKincl. 21% VAT | 485 CZKexcl. VAT587 CZKincl. 21% VAT | 437 CZKexcl. VAT529 CZKincl. 21% VAT |
| 22–24 km | 766 CZKexcl. VAT927 CZKincl. 21% VAT | 511 CZKexcl. VAT618 CZKincl. 21% VAT | 460 CZKexcl. VAT557 CZKincl. 21% VAT |
| 24–26 km | 805 CZKexcl. VAT974 CZKincl. 21% VAT | 537 CZKexcl. VAT650 CZKincl. 21% VAT | 483 CZKexcl. VAT584 CZKincl. 21% VAT |
| 26–28 km | 844 CZKexcl. VAT1,021 CZKincl. 21% VAT | 563 CZKexcl. VAT681 CZKincl. 21% VAT | 506 CZKexcl. VAT612 CZKincl. 21% VAT |
| 28–30 km | 883 CZKexcl. VAT1,068 CZKincl. 21% VAT | 589 CZKexcl. VAT713 CZKincl. 21% VAT | 530 CZKexcl. VAT641 CZKincl. 21% VAT |
| 30–35 km | 922 CZKexcl. VAT1,116 CZKincl. 21% VAT | 614 CZKexcl. VAT743 CZKincl. 21% VAT | 553 CZKexcl. VAT669 CZKincl. 21% VAT |
| 35–40 km | 961 CZKexcl. VAT1,163 CZKincl. 21% VAT | 640 CZKexcl. VAT774 CZKincl. 21% VAT | 576 CZKexcl. VAT697 CZKincl. 21% VAT |
After 30 minutes of unloading, a 200 CZK fee applies for each additional started 15-minute period.
Concrete, delivery and pumping price list · Effective from 1 March 2025
Pumping
The hourly rate includes preparation and cleaning. Setup, transport and pumped volume are charged separately.
The hourly rate includes preparation and cleaning. Setup, transport and pumped volume are charged separately.
| Product / variant | Price excl. VAT | Price incl. VAT21 % | Final price | Add to enquiry |
|---|---|---|---|---|
| Pump 28 m | 2,400 CZK/ h | 2,904 CZK/ h | The final pumping price is based on the work carried out. | |
| Pump 36 m | 2,800 CZK/ h | 3,388 CZK/ h | The final pumping price is based on the work carried out. | |
| Pump 38 m | 2,900 CZK/ h | 3,509 CZK/ h | The final pumping price is based on the work carried out. | |
| Pump 42 m | 3,000 CZK/ h | 3,630 CZK/ h | The final pumping price is based on the work carried out. | |
| Pump 46 m | 3,200 CZK/ h | 3,872 CZK/ h | The final pumping price is based on the work carried out. | |
| Pump 52 m | 4,400 CZK/ h | 5,324 CZK/ h | The final pumping price is based on the work carried out. | |
| Pump 58 m | 4,800 CZK/ h | 5,808 CZK/ h | The final pumping price is based on the work carried out. |
Pump setup
| Item | Excl. VAT | Incl. 21% VAT |
|---|---|---|
| Setup of 28 m pumpper pcs | 2,500 CZK | 3,025 CZK |
| Setup of 36 m pumpper pcs | 2,800 CZK | 3,388 CZK |
| Setup of 38 m pumpper pcs | 3,000 CZK | 3,630 CZK |
| Setup of 42 m pumpper pcs | 3,200 CZK | 3,872 CZK |
| Setup of 46 m pumpper pcs | 3,300 CZK | 3,993 CZK |
| Setup of 52 m pumpper pcs | 4,200 CZK | 5,082 CZK |
| Setup of 58 m pumpper pcs | 4,200 CZK | 5,082 CZK |
Pumped-volume fees
| Item | Excl. VAT | Incl. 21% VAT |
|---|---|---|
| Pumped volume · 28 m pumpper m³ | 10 CZK | 12 CZK |
| Pumped volume · 36 m pumpper m³ | 20 CZK | 24 CZK |
| Pumped volume · 38 m pumpper m³ | 30 CZK | 36 CZK |
| Pumped volume · 42 m pumpper m³ | 40 CZK | 48 CZK |
| Pumped volume · 46 m pumpper m³ | 50 CZK | 61 CZK |
| Pumped volume · 52 m pumpper m³ | 60 CZK | 73 CZK |
| Pumped volume · 58 m pumpper m³ | 70 CZK | 85 CZK |
| Fibre-reinforced concrete pumpingper m³ | 25 CZK | 30 CZK |
Pump transport and other services
| Item | Excl. VAT | Incl. 21% VAT |
|---|---|---|
| Pump transport · batching plant, site and returnper km | 55 CZK | 67 CZK |
| Rubber hoses up to 125 mmper linear m/day | 130 CZK | 157 CZK |
| Steel piping up to 125 mmper linear m/day | 110 CZK | 133 CZK |
| Residual concrete removal · no cleaning possible on site | 1,000 CZK | 1,210 CZK |
| Pump priming compound | 600 CZK | 726 CZK |
| Stationary pump operation | 1,800 CZK | 2,178 CZK |
| Stationary pump transport | 40 CZK | 48 CZK |
| Rubber piping for stationary pumpper linear m/day | 60 CZK | 73 CZK |
| Surcharge for pumped volume above 20 m³per m³ | 30 CZK | 36 CZK |
| Late pump cancellation · less than 24 hours in advance | 2,800 CZK | 3,388 CZK |
Unnecessary pump dispatch: the hourly pump rate plus 80 CZK/km. The PDF also applies the listed 38 m setup and volume rates to 39 m pumps. Our sales team will confirm units not specified for some services.
Concrete, delivery and pumping price list · Effective from 1 March 2025
Tests and surcharges
Testing services
| Item | Excl. VAT | Incl. 21% VAT |
|---|---|---|
| Preparing test specimens on siteper pcs | 250 CZK | 303 CZK |
| Slump test on siteper pcs | 250 CZK | 303 CZK |
| Air content test on siteper pcs | 600 CZK | 726 CZK |
| Compressive strength testper pcs | 380 CZK | 460 CZK |
| Water penetration depth testper pcs | 1,250 CZK | 1,513 CZK |
| Technologist vehicle travelper km | 30 CZK | 36 CZK |
Surcharges and other services
| Item | Excl. VAT | Incl. 21% VAT |
|---|---|---|
| Winter operation · 20 November to 31 Marchper m³ | 100 CZK | 121 CZK |
| Out-of-hours · weekends, holidays, weekdays 20:00–06:00per m³ | 120 CZK | 145 CZK |
| Residual concrete disposalper m³ | 800 CZK | 968 CZK |
| Setting accelerator on requestper m³ | 200 CZK | 242 CZK |
| Plasticiser used on siteper l | 50 CZK | 61 CZK |
| Late cancellation · less than 24 hours in advance | 2,800 CZK | 3,388 CZK |
On-site testing must be ordered by noon on the preceding day. Other requirements are quoted individually.
Prices follow the supplied price lists and their stated effective dates. Availability and the final quotation will be confirmed by our sales team.
Let’s find your solution.
Let’s discuss materials, quantities and delivery. We’ll help you choose the right approach.
+420 725 505 577+420 311 234 820info@destrobeton.czMartin Motyčák
Sales representative for concrete, aggregates and construction waste
+420 725 505 577+420 311 234 820
martin.motycak@destro.cz
Halda, U Chladičů
272 01 Kladno
Monday–Friday · 6:00–15:30